Tim SullivanAdrian Troy

BSc, MAusIMM

Country of Citizenship

Australia

Educational Qualifications

Bachelor of Science (Geology), University of Queensland (1999)
Rock Mechanics Certificate, University of British Columbia (2006)
Master of Engineering Science (Geotechnical Engineering), University of New South Wales (in progress)

Professional Associations

Australasian Institute of Mining and Metallurgy,
(2006) Nominee AusIMM Geoscience Task Force,
(2008) AusIMM Committee Member - Perth branch.

Submissions

Datamine Australia Pty Ltd (feature calendar) – 2003 (April), “Lithology and Structure of Ranger Mine Pit #3”.

Adrian completed a Bachelor of Science (Geology) in 1999 and began work as Mine Geologist for the Ranger Uranium Mine (ERA) in 2000. He transferred to Robe River’s West Angelas Operation in 2002 to primarily continue geological coverage and undertook a leading on-site role in both the slope management program and slope design studies for the open pit and waste dump regions. Adrian joined Hamersley Iron in 2004 as a Geological Engineer within their Pilbara based geotechnical group servicing the fly in/fly out operations of West Angelas, Brockman and
Marandoo. In 2006 Adrian was assigned a residential role at Tom Price as their Project Geotechnical Engineer principally involved with cut back investigations and geotechnical optimisation studies.

Adrian completed additional rock mechanics studies in collaboration with the University of British Columbia and since joining PSM in 2007 is playing a leading role in the Pilbara wide projects.

FIELDS OF SPECIAL COMPETENCE

• Desktop evaluation and conceptual slope design
• Design and management of pre-feasibility and feasibility field programs
• Development of geotechnical models in bedded and porphyry settings
• Pit Design and geotechnical operation of pit excavations and dumps
• Photogrammetric modelling, mapping and analysis
• Slope monitoring and evaluation

EXPERIENCE

2009-Present Associate Engineering Geologist, PSM
2007-2009 Senior Engineering Geologist, PSM
2005-2007 Project Geological Engineer, Pilbara Iron
2004-2005 Geological Engineer, Hamersley Iron
2002-2004 Mine Geologist, Robe River Mining
2000-2002 Mine Geologist, Energy Resources of Australia

Global Option MapView Pells Sullivan Meynink's current global projects.

Project Sites
Map

Current Projects

Brisbane Airport Link

Brisbane’s $4.8 billion Airport Link, Northern Busway (Windsor... Bullet READ MORE

Kapit Pit Geotechnical Investigation

PSM is involved with Lihir Gold’s Kapit Pit, providing geotechnical... Bullet READ MORE